Honor and Certification Information
1.DNV Type Approval Certificate of Anode

2. Supplier Qualification Certification Of Saudi Aramco

3. Supplier Qualification Certification Of TOTAL

4. Supplier Qualification Certification of GE Oil&Gas

5. Supplier Qualification Certification of SABIC

6. Anode Certification By The Third-part Inspector ABS

7. Anode Certification By The Third-part Inspector BV(Bureau Veritas)(Electrochemical Capacity ≥2600 Ah/kg)

8. Anode Certification By The Third-part Inspector DNV(DET NORSKE VERITAS)

9. High temperature Zinc alloy Anode Certification By The Third-part Inspector BV

Company Honor Certificate
1.China National Award for Science and Technology Progress with Grade I (Highest level in China)

2.China Gold award of national high quality project(Highest level in China)

3.Key high-tech enterprise of China national torch program

Major Overseas Marine Engineering Performance of Sunrui
(1) Brazil FPSO P76 Project
Client: ESTALEIRO ENSEADA DO PARAGUAÇU S.A.
Owner: ESTALEIRO ENSEADA DO PARAGUAÇU S.A.
Location: Brazil
Date:2013
Design Life:20 years
Material: Al-Zn-In
Anodes quantity: 180 tones Aluminium Stand Off Anodes
Project Description: Our scope is material supply for anode used in FPSO cargo tanks for ESTALEIRO ENSEADA DO PARAGUAÇU S.A

(2) SBM Fast4ward FPSO Project(H1468/H1497)
Client: Shanghai Waigaoqiao Shipbuilding and Offshore Co.,Ltd..
Date:2018
Design Life: 10 years
Material: Zn Anode
Anodes quantity:560 tones Zinc Anodes
Project Description: Our scope is material supply for high temperature and normal temperature anode used in SBM Fast4ward FPSO .

(3) CNOOC Liuhua 16-2 Oilfield FPSO Project
Client: Qingdao Beihai Shipbuilding Heavy Industry Co. Ltd...
Owner: CNOOC
Location: China
Date:2018
Design Life: 15 years
Material: Al Anode
Anodes quantity: 337 tones Al Anodes
Project Description: Our scope is material supply for Al anode used in CNOOC Liuhua 16-2 Oilfield FPSO Project

(3) Zawtika Development Phase 1B Project
Client: PTT Exploration and Production Public Company Limited
Owner: Petroleum Authority of Thailand,PTT
Location: southern Myanmar;
Design Life: 50 years
Date:2015~2016
Material: Al-Zn-In
Anodes quantity: 758 tones Aluminium Stand Off Anodes
Project Description: Our scope is design and material supply for the cathodic protecin for Zawtika Development Phase 1B Project.

(5) One Sub sea Project
Client: Cameron & Schlumberger Company
Owner: One Sub sea
Location: Over world;
Date:2014~2017
Design Life: 30 years
Material: Al-Zn-In
Anodes quantity: 80 tones Aluminium Stand Off Anodes
Project Description: Our scope is material supply for thecold water anode used in oil trees for OneSubsea since 2014~now.

(6) Vinh Tan 1 BOT Coal-fired Power Plant Port Project
Client: Electricity of Vietnam
Owner: Electricity of Vietnam
Location: Binh Thuan;
Design Life: 30 years
Date:2016
Material: Al-Zn-In
Anodes quantity: 160 tones Aluminium Stand Off Anodes
Project Description: Our scope is design and material supply for the cathodic protecin of Vinh Tan 1 BOT Coal-fired Power Plant Port Project

(7) PTSDIC Papua Cement Indonesia harbor wharfs Project
Client: PTSDIC Papua Cement Indonesia
Owner: PTSDIC Papua Cement Indonesia
Location: Papua, Indonesia
Design Life: 30 years
Date:2016
Material: Al-Zn-In
Anodes quantity: 280 tones Aluminium Stand Off Anodes
Project Description: Our scope is design and material supply for the cathodic protecin of PTSDIC Papua Cement Indonesia harbor wharfs Project

(8) Liwan Deep Water Project
Client: Saipem (Portugal) Comercio Maritimo,
Owner: Husky Oil China Ltd
Location: China
Design Life: 50 years
Date:2012~2013
Material: Al-Zn-In
Anodes quantity: 120 tones Aluminium Stand Off Anodes
Project Description: Our scope is material supply for the cold water anode

(9) "Felicity Modec" MV34 FPSO Project
Client: Modec
Owner: ENI
Ship Yard: COSCO
Design Life: 20 years
Date:2019
Material: Al-Zn-In,Zn-In
Anodes quantity: 250tones Anodes
Project Description: Our scope is material supply for the anode

(10) Karish FPSO Project
Owner: Energean
Ship Yard: COSCO
Design Life: 20 years
Date:2019
Material: Al-Zn-In,Zn-In
Anodes quantity: 270 tones Anodes
Project Description: Our scope is material supply for the anode

(11) "Tortue /Ahmeyim LNG" N999 FPSO Project
Client: TechnipFMC
Owner: BP FEED
Ship Yard: COSCO
Design Life: 20 years
Date:2019
Material: Al-Zn-In,Zn-In
Anodes quantity: 1100 tones Anodes
Project Description: Our scope is Cathodic Protection Detail Design and material supply for the anode

(12) Marjan giant oil field Project
Client: Larsen & Toubro (L&T)
Owner: Saudi Aramco
Design Life: 20 years
Date:2019~2020
Material: Al-Zn-In
Anodes quantity: 800 tones Anodes
Project Description: Our scope is Cathodic Protection Detail Design and material supply for the anode

Detail Performance of Cathodic Protection in Marine and Port Engineering in Recent Years
No. | Customer | Project Name | Anode specification | Unit | Quantity | Date |
1 | SHENZHONG LINK ADMINISTRATION CENTER | Sacrificial anode for steel shell of submarine immersed tube tunnel | Aluminium Alloy Sacrificial Anode; Gross weight:405kg | set | 17285 | 2018.07 |
2 | Ningbo Branch of CCCC Third Harbor Engineering Company Ltd | Cathodic Protection of Steel Pipe Piles in Yushan Wharf of Zhejiang Petrochemical Company | Aluminium Alloy Sacrificial Anode; Gross weight:126.35kg | set | 5907 | 2018.04 |
3 | HUADIAN Heavy Industry Co.,Ltd. | Sacrificial Anode for Pile Foundation of Dafeng H3 Marine Wind Farm | Aluminium Alloy Sacrificial Anode; | ton | 260.38 | 2018.03 |
4 | Shanghai Third Harbor Engineering and Trade Co., Ltd. | Sacrificial Anode for Pile Foundation of Dafeng Marine Wind Farm | Aluminium Alloy Sacrificial Anode; | ton | 323.4 | 2018.03 |
5 | Shanghai Third Harbor Engineering and Trade Co., Ltd. | Sacrificial Anode for Putuo No.6 Offshore Wind Farm in Zhoushan | Aluminium Alloy Sacrificial Anode; | ton | 315.3 | 2018.03 |
6 | COMPLANT International Transportation Co., Ltd. | Cathodic protection of steel pipe piles in Ram Harbour, Kenya | Aluminium Alloy Sacrificial Anode; Gross weight:299.9kg | set | 2880 | 2018.02 |
7 | Shanghai Waigaoqiao Shipbuilding and Offshore Co.,Ltd. | Sacrificial anode cathodic protection of FPSO | Zinc Alloy Sacrificial Anode Used at Normal atmospheric temperature | set | 2787 | 2017.12 |
Zinc Alloy Sacrificial AnodeUsed at high temperature | set | 2150 | ||||
Aluminium Alloy Sacrificial Anode;Used at Normal atmospheric temperature | set | 7 | ||||
Aluminium Alloy Sacrificial Anode;Used at high temperature | set | 118 | ||||
8 | Bohai Petroleum Navigation Construction Engineering Co., Ltd. | T-type Aluminium Alloy Sacrificial Anode for Jacket of Production Platform of Penglai 19-3 Development Project | Aluminium Alloy Sacrificial Anode; Gross weight:493.4kg | set | 968 | 2017.12 |
9 | CNOOC (Tianjin) Pipeline Engineering Technology Co., Ltd. | Aluminum alloy sacrificial anode for common jacket of oil production platform | Aluminium Alloy Sacrificial Anode; Gross weight:380.1kg | set | 869 | 2017.08 |
10 | Bohai Petroleum Navigation Construction Engineering Co., Ltd. | T-type Aluminium Alloy Sacrificial Anode for Jacket of Production Platform of Bozhong 34-9 Development Project | Aluminium Alloy Sacrificial Anode; Gross weight:493.4kg | set | 468 | 2017.07 |
11 | HUADIAN Heavy Industry Co.,Ltd. | Sacrifice Anode for Pile Foundation of p Marine Wind Farm Project in Binhai North Area of Jiangsu Province | Aluminium Alloy Sacrificial Anode; | ton | 716.4 | 2016.12 |
12 | No.1 Engineering Company Ltd.of CCCC First Harbor Engineering Company Ltd | Sacrificial Anode for Tianjin Yuanhang Ore Terminal | Aluminium Alloy Sacrificial Anode; | ton | 263.3 | 2016.1 |
13 | Shanghai Branch of CCCC Third Harbor Engineering Company Ltd | Sacrificial Anode for Lingang Offshore Wind Farm | Aluminium Alloy Sacrificial Anode; Gross weight:195.4kg | set | 320 | 2015.11 |
Aluminium Alloy Sacrificial Anode; Gross weight:229.4kg | set | 592 | ||||
14 | No.1 Engineering Company Ltd.of CCCC First Harbor Engineering Company Ltd | Sacrificial anode cathodic protection for steel pipe piles of Coal Wharf in Huaneng Tangshan Port Caofeidian Port Area | Aluminium Alloy Sacrificial Anode; Gross weight:134.5kg | set | 1900 | 2015.09 |
15 | Offshore Oil Engineering (Zhuhai)Co., Ltd. | Aluminium alloy sacrificial anodes for offshore jacket of ZAWTIKA-1B in Thailand | Aluminium Alloy Sacrificial Anode; Gross weight:474.3kg | set | 1910 | 2015.03 |
2.4 Others Oversea Experiences List of Cathodic Protection Products (International Owner) in Recent Years
Region | Country | Company | Time | Scope of Supply |
Europe | Kongeriget Danmark | BLADT IDUSTRIES | 2016 | Aluminum Anode, 450Tons |
The Netherlands &Germany | Corrosion & Water Control bv. | 2008 | Zinc and Aluminum Anodes For Ship Hull | |
2009 | ||||
2010 | Zinc and Aluminum Anodes For Ship Hull | |||
2011 | Zinc and Aluminum Anodes For Ship Hull | |||
2012 | Aluminum Anodes For Ship Hull | |||
2013 | Aluminum Anode | |||
CAMERON | 2014 | Aluminum Anode | ||
France | CESM | 2011 | Mould | |
Italy | Saipem | 2011 | Aluminum Anode | |
2012 | Aluminum Anode | |||
2013 | Aluminum Anode | |||
Pan-middle East | Iran | DANA CORROSION CONTROL | 2012 | Heat-shrinkable bush |
India | Bhotika | 2011 | Aluminum Anode | |
PLL | 2011 | Aluminum Anode | ||
2012 | Aluminum Anode | |||
India | L & T | 2019 | Aluminum Anode | |
2020 | Aluminum Anode | |||
Turkey | ICDAS CelikEnerjiTersaneveUlasimSanayi A.S | 2009 | Sacrificial Anode | |
2011 | Sacrificial Anode | |||
Kuwait | HAMA trading & contracting CO. | 2009 | MMO Anode Junction box | |
Integral Services Company W.L.L | 2009 | Zinc Anode | ||
2010 | Zinc Anode | |||
Saudi Arabia | Aramco Overseas Company B.V. | 2009 | Zinc Anode and Aluminum Anode | |
2010 | Zinc Anode and Aluminum Anode | |||
2012 | Aluminum Anode | |||
AFIC | 2012 | Impressed Current Cathodic Protection (ICCP) System | ||
U.A.E. | Corrpro Companies Middle East L.L.C | 2009 | MGPS Cu/Fe/Al Anode | |
2010 | MGPS Cu/Fe/Al Anode | |||
Asia | Hong Kong | Associated Maritime Co. (HK) Ltd | 2009 | Zinc and Aluminum Anodes For Ship Hull and Ballast Tank |
2011 | Zinc and Aluminum Anodes For Ship Hull and Ballast Tank | |||
2013 | Zinc and Aluminum Anodes For Ship Hull and Ballast Tank | |||
HongKongDiya Environmental Protection | 2009 | Zinc and Aluminum Anodes For Ship Hull and Ballast Tank | ||
2010 | Zinc and Aluminum Anodes For Ship Hull and Ballast Tank | |||
2011 | Seawater Electrolysis Apparatus | |||
2012 | Seawater Electrolysis Apparatus | |||
Kazakhstan | TAP Line | 2013 | Impressed Current Cathodic Protection (ICCP) System | |
Malaysia | Cathoway | 2012 | Zinc anode | |
best wide corrosion tech.sdn.bhd | 2013 | Zinc and Magnesium Anode | ||
Asia | Turkmenistan | CNPCI | 2013 | Impressed Current Cathodic Protection (ICCP) System |
Syria | WIC11058 | 2011 | Sacrificial Anode, Coating,Rectifier, Anode and Reference Electrode | |
North America | Canada | L.Z.Construction Technologies Ltd. | 2010 | Aluminum Anode |
2012 | Aluminum Anode | |||
2013 | Aluminum Anode | |||
The U.S.A | OiltechSolutions | 2014 | Impressed Current Cathodic Protection (ICCP) System | |
South America | Brazil | ESTALEIRO ENSEADA DO PARAGUAÇU S.A., | 2013 | Aluminum Anode |
Australia | Australia | Pipecorr Pty Ltd | 2009 | Magnesium Anode |
2010 | Magnesium Anode | |||
2011 | Magnesium Anode | |||
2012 | Magnesium Anode | |||
Africa | Egypt | Suez Canal Authority | 2011 | Zinc Anodes For Ship Hull |
2013 | High Pure Zinc Anodes For Ship Hull | |||
Alexander Shipyard | 2009 | Zinc Anodes For Ship Hull | ||
Nigeria | BROSSOL SPECIALTY SERVICES LIMITED | 2013 | Impressed Current Cathodic Protection (ICCP) System | |
Tanzania | Q&M International Limited | 2013 | Aluminum Anode | |
Algeria | Sonatrach | 2007 | Impressed Current Cathodic Protection (ICCP) System | |
2008 | Impressed Current Cathodic Protection (ICCP) System | |||
Sudan | RAM | 2011 | Sacrificial Anode, Coating,Rectifier, Anode and Reference Electrode | |
PetrodarPetrol Operation Company | 2007 | Impressed Current Cathodic Protection (ICCP) System | ||
2008 | Impressed Current Cathodic Protection (ICCP) System | |||
2009 | Impressed Current Cathodic Protection (ICCP) System | |||
2010 | Impressed Current Cathodic Protection (ICCP) System | |||
2013 | Impressed Current Cathodic Protection (ICCP) System |
2.5 Performance of Oversea Offshore Aluminum Anodes
Serials | Project Name | Specification(Inside Dia.*Outside Dia.*Length) | Date |
1 | Zawtika Development Phase 1B Project,PTT Exploration and Production Public Company Limited | Stand-off anode.(3040+2960)*(220+240)*250mm, Net weight 383.3 kg, Gross weight 474 kg | 2015.1 |
2 | OneSubsea- A Cameron & Schlumberger Company | Flush Mounting. Deep water type, comply with Cameron Spec. 252534. size is 6.5*5.75*30 inch, Net weight 44 kg, Gross weight 48 kg | 2014 |
3 | ESTALEIRO ENSEADA DO PARAGUAÇU S.A. Brazil FPSO P76 Project | Stand-off mounting, net weight 19.1Kg, gross weight 19.6Kg for FPSO cargo tanks | 2013.9 |
4 | Tanzania Mnazi and Songo Songo Natural Gas Processing Plants and Transportation Pipeline Project | Bracelet Anode,NW 196 kg,Φ454×Φ626×454 Bracelet Anode,NW 87 kg,Φ412×Φ562×300 | 2013.8 |
5 | GSPC, India, Deen Dayal Field Development Project PO 4502947534 | Bracelet Anode,NW 70.75 kg,Φ517.5×Φ617.5×320 | 2012.4 |
Bracelet Anode,NW 54.96,Φ517.5×Φ597.5×320 | |||
Bracelet Anode,NW 86.9,Φ426×Φ506×600 | |||
6 | BG India Ltd, Panna New SPM System and Pipeline Project, PO 332076 | Standoff Anodes, 2000*(148+175) *153 mm, NW 120 kg | 2011.12 |
7 | Saipem (Portugal) Comercio Maritimo, Sociedade Unipessonal, LDA, PO 705962, Liwan Deep Water Project | Slend Anode, 600*160*160 mm, NW 37.5 kg, GW 41.6 kg | 2012.3 |
8 | Saipem (Portugal) Comercio Maritimo, PO 752332 | Slend Anode, 600*160*160 mm, NW 37.5 kg, GW 41.6 kg | 2013.4 |
9 | CESM Z.I de la (France), Benin LNG Port | A114P, 1500*(148+178) *170 mm, NW 114kg, GW 120kg | 2011.8 |
10 | L.Z Construction Technologies Ltd, LCT 100801 | Standoff Anodes, 1500*(195+175) *180 mm, NW 127 kg, GW 140 kg | 2010.8 |
11 | ARAMCO OVERSEAS COMPANY B.V. PO 4503613418 | ANODE GALVANIC; PER STANDARD DWG AA-036389,34.5 KG (76 LB),50.8 MM (2 IN) WD X 6.4MM (1/4 IN) THK | 2012.3 |
12 | ARAMCO OVERSEAS COMPANY B.V. PO 4502947534 | Bracelet type, 42 inch, NW 146kg,GW161kg; 36 inch, NW 126kg,GW142kg; | 2010.4 |
13 | PIPECORR PTY LTD, Australia, FLINDERS PORTS PO: PC008786 | Slend Anode, 2600*(170 + 194) *175 mm; NW 218, GW 236 kg 1200*(192+210) *165 mm; NW 105, GW 119kg; 1200*(182+210) *160 mm; NW 99, GW 112kg | 2009.8 |
3.Company and Product Certification
3.1 Company Qualification list
No. | Certification | Certification Organization |
1 | Enterprise business license | Qingdao administration for industry and commerce |
2 | Anti-corrosion construction professional qualification (lever one) | China construction ministry |
3 | Anti-corrosion construction qualification (lever one) | China society for corrosion and protection |
4 | Certification of safety production | Shandong construction ministry |
5 | Management System Certification of Environment | China quantity control Association |
6 | Management System Certification of Quantity | China quantity control Association |
7 | Management System Certification of Safety | China quantity control Association |
8 | DNV type approval certificate | DNV |
9 | Supplier Qualification certification of Saudi Aramco | Saudi Aramco |
10 | Supplier Qualification certification of TOTAL | TOTAL |
11 | Supplier Qualification certification of GE Oil & Gas | GE Oil & Gas |
12 | Supplier Qualification certification of SABIC | Saudi Basic Industries Corporation |
13 | Supplier Qualification certification of CNPC | China National Petroleum Corporation |
14 | Product Certification By The Third-part Inspector SGS | Societe Generale de Surveillance S.A. |
15 | Product Certification By The Third-part Inspector VELOSI | The VELOSI Group |
16 | Product Certification By The Third-part Inspector BV (Bureau Veritas) | Bureau Veritas |
17 | Product Certification By The Third-part Inspector DNV (DET NORSKE VERITAS) | DET NORSKE VERITAS |
18 | Product Certification By The Third-part Inspector Moody | Moody International Group |
